Renewable Energy Development & Energy Efficiency Measure of Bangladesh Power Development Board (BPDB)
Solar Home Lighting System under Solar PV Electrification Project in the CHT Regions:
BPDB has implemented an excellent
Solar PV electrification project in the Chittagong Hill Tracts
region with support from Ministry
of Chittagong Hill Tracts Affairs.
The main reasons for undertaking this SPV project are
given below:
-
The extension as well as the maintenance of the National Grid into these areas is very highly expensive, difficult and risky.
-
The transportation of fuels for the localized generators in these areas is also very highly expensive, difficult and risky.
-
The load density of these areas is low and disperse.
Considering above characteristics of the remote and hilly areas, the Solar PV electrification has emerged as the most appropriate technological option for the electrification of these areas. The people are enthusiastically purchasing the Solar Home Lighting Systems(SHLS). More people will be brought under SHLS for their households. They are mass interest among CHT people to procure SHLS for their households but also giving monthly payments regularly.
The BPDB’s SPV electrification project consists of the following Solar PV Systems:
Solar Home Lighting System :
1100 Solar Home Systems of 120 Wp each
Borkol Upazila = 300 SHLS
-
Borkol Upazila(Rangamati District), Total SHLS installed 300, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.

-
Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp
-
System delivery mechanism, BPDB handed over system by taking 2,500TK from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.
-
2 LED lamp with capacity 0.3Wp
Juraichari Upazila = 300 SHLS
-
Juraichari Upazila(Rangamati District), Total SHLS installed 300, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.
-
Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp
-
System delivery mechanism, BPDB handed over system by taking 2,500TK from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.
-
2 LED lamp with capacity 0.3Wp
Thanchi Upazila = 500 SHLS
-
Thanchi Upazila(Bandarban District), Total SHLS installed 500, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.

-
Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp
-
System delivery mechanism, BPDB handed over system by taking 2,500TK from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.
-
2 LED lamp with capacity 0.3Wp