Renewable Energy Projects of BPDB: under planning

 

Grid Connected Solar Projects:

 

Sl. NO

Location

 Capacity (MW)

1

Sharisabari, Jamalpur

2-4

2

Proposed BPDB Regional Training Centre, Rajshahi

  1

3

Rajabarihat, Godagari,Rajshahi

 2-4

4

Kaptai Power Station

4-5

5

St. Martin Island

 1

 

Total

10-15

 

    

Solar Home Projects

 

Solar Home System in all Offices of BPDB in phases for Lighting Purposes (150-200 kWp): 150 – 200 KWp

 

 

 

Solar PV Electrification Project in the CHT Regions:

 

BPDB has implemented an excellent Solar PV electrification project in the Chittagong Hill Tracts region with support from  Ministry of  Chittagong Hill Tracts Affairs The main reasons for undertaking this SPV project are given below:

 

  • The extension as well as the maintenance of the National Grid into these areas is very highly expensive, difficult and risky. 

  • The transportation of fuels for the localized generators in these areas is also very highly expensive, difficult and risky.

  • The load density of these areas is low and disperse.

 

Considering above characteristics of the remote and hilly areas, the Solar PV electrification has emerged as the most appropriate technological option for the electrification of these areas. The people are enthusiastically purchasing the Solar Home Lighting Systems(SHLS). More people will be brought under SHLS for their households. They are mass interest among CHT people to procure SHLS  for their households but also giving monthly payments regularly.

 

To date ( June/ 2009) BPDB installed capacity in entire CHT region being estimated as total of 200kW.

 

The BPDB’s SPV electrification project consists of the following Solar PV Systems:

 

Solar Home Lighting System :

 

1100 Solar Home Systems of 120 Wp each

 

Borkol Upazila = 300 SHLS

 

  • Borkol Upazila(Rangamati District), Total SHLS installed 300, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.

  • Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp

  • System delivery mechanism, BPDB handed over system by taking  2,500TK  from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.

  • 2 LED  lamp with capacity 0.3Wp   

  •  

 

Juraichari Upazila = 300 SHLS

 

  • Juraichari Upazila(Rangamati District), Total SHLS installed 300, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.

  • Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp

  • System delivery mechanism, BPDB handed over system by taking  2,500TK  from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.

  • 2 LED  lamp with capacity 0.3Wp   

Thanchi Upazila = 500 SHLS

 

  • Thanchi Upazila(Bandarban District), Total SHLS installed 500, System Capacity 120Wp(each), Loads 4 CFL Lamp (11W each), 1 TV (15" BW)Point.

  • Hardware ; 1 Deep Cycle Battery with 130Ahr , 1 PV panel with 120 Wp

  • System delivery mechanism, BPDB handed over system by taking  2,500TK  from users and monthly 200 TK installment to be paid to BPDB for 20 Years period.

  • 2 LED  lamp with capacity 0.3Wp   

 

 

Solar PV Street Light Systems

Total 95 Sets of Solar PV Street Light Systems so far installed in CHT region


Juraichari Upazila = 75 Sets
  • System Capacity 75 Wp, Load ; 11w CFL
Borkol Upazila = 10Sets
  • System Capacity 75 Wp, Load ; 11w CFL
  • Thanchi Upazila = 10Sets
  • System Capacity 75 Wp, Load ; 11w CFL
  •  

    Solar PV Submersible Water Pump

     

    3 Sets of Solar PV Submersible Water Pumps of 50,000 litters per day lifting capacity of each pump.

     

    Borkol Upazila = 1 Solar PV Submersible Water Pump

     

    • Location : Village -  Baghasola,  1no Shuvolong Union under Borkol Upazila

    • System capacity 1.8kWp Panel - total 24 ( 75Wp each) 

    • Pump type; DC powered submersible, 175 hp pump lifting water from deep tube well,  lifting 50,000 litters water per day, which being reserved in overhead tank

    • Beneficiary :  System installed at Buddha temple, so far monks/nuns , local villagers uses  water, moreover peoples gathered for tribal festival and community functions also being served from this water pump 

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

    Juraichari Upazila = 1 Solar PV Submersible Water Pump

     

    • Location : Juraichari Upazila

    • System capacity 1.8kWp Panel - total 24 ( 75Wp each) 

    • Pump type; DC powered submersible, 175 hp pump lifting water from deep tube well,  lifting 50,000 litters water per day, which being reserved in overhead tank

    • Beneficiary :  Local tribal villagers

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

    Thanchi  Upazila = 1 Solar PV Submersible Water Pump

     

    • Location : Juraichari Upazila

    • System capacity 1.8kWp Panel - total 24 ( 75Wp each) 

    • Pump type; DC powered submersible, 175 hp pump lifting water from deep tube well,  lifting 50,000 litters water per day, which being reserved in overhead tank

    • Beneficiary :  Local tribal villagers

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

    Solar PV Vaccine Refrigerators

    9 Sets of Solar PV Vaccine Refrigerators for the Health Care Centres

     

     

    Belaichari  Upazila = 2  Solar PV Vaccine Refrigerators

    • Location : Belaichari Upazila

    • System capacity 225Wp, Panel - total 3 ( 75Wp each) 

    • DC powered Vaccine Refrigerator, Capacity : 50Liters 

    • Beneficiary : Hospitals/health centers

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

     

    Thanchi  Upazila = 2  Solar PV Vaccine Refrigerators

    • Location : Thanchi Upazila

    • System capacity 225Wp, Panel - total 3 ( 75Wp each) 

    • DC powered Vaccine Refrigerator, Capacity : 50Liters   

    • Beneficiary : Hospitals/health centers 

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

    Borkol  Upazila = 2  Solar PV Vaccine Refrigerators

    • Location : Borkol Upazila

    • System capacity 225Wp, Panel - total 3 ( 75Wp each) 

    • DC powered Vaccine Refrigerator, Capacity : 50Liters 

    • Beneficiary : Hospitals/health centers

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

    Centralized AC Market Electrification Systems

    3 Sets of 10 KW Centralized AC Market Electrification Systems for the electrification of more than 200 shops in each market.

     

     

    Juraichari  Upazila = 1  Centralized(AC)Solar PV Powered

    • Location : Juralchari Upazila

    • System capacity :

    • Beneficiary :

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

    Borkol  Upazila = 1  Centralized(AC)Solar PV Powered

    • Location : Juralchari Upazila

    • System capacity :

    • Beneficiary : Borkol Upazila offices , Tribal House holds

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

     

    Thanchi  Upazila = 1  Centralized(AC)Solar PV Powered

    • Location : Juralchari Upazila

    • System capacity :

    • Beneficiary :

    • Financial support : Ministry of  Chittagong Hill Tracts Affairs

     

     

    The contents of this project are quite unique in Bangladesh. All systems are the most suitable options for the electrification of the remote areas, development centers, health care centers etc. Only the BPDB solar PV project in the CHT regions has covered all these solar PV items which are most essential for the remote localities.   

     

      

    This unique project is being implemented in three phases:

     

    • First Phase in Jurachhari Upazilla

    • Second Phase in Barkal Upazilla

    • Third Phase in Thanchi Upazilla

      

    A 10 kW central AC solar PV system has installed in one selected market in each Upazilla Sadar of the above-mentioned upazillas. With these systems, the shops of that market have been electrified with overhead  AC distribution connectivity. Ten numbers of solar PV street lights have also been installed in the streets of the Upazilla center. Three solar PV vaccine refrigerators have also been installed in three hospitals/health centers of the Belaichhari Upazilla.

     

    A 1800 Wp solar PV submersible water pump has been installed in one selected market in each Upazilla Sadar of the above-mentioned upazillas for supplying drinking water to the hill tracts people. This water pump delivers 50,000 liters of pure drinking water every day. This water pump is likely to ease the hardships of the hill tracts people for collecting their every day drinking water.

     

    A Beneficiary Management Committee (BMC) has been formed with representatives from the government offices and local hill tracts communities. The BMC is responsible for revenue collections from the solar electricity consumers, operation & maintenance of the SPV systems and also for the future further expansion of the systems to more households.

     ..........................................................................................................................................................

     

    (Picture :  Solar Arrays of 10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.)

    Another Solar Electrification project is going on at Thanchi Upozila at Rangamati district. It consists 600 Sets Solar Home system of 120 Mp each, 2 Sets of Solar PV Vaccine Refrigerators for the Health Care Centers of 360 Wp(3X120Wp) each , 10 sets Solar PV Street Light Systems of 75 Wp each, 1 set Solar PV Submersible Water Pumps of 50,000 liters per day lifting capacity of each pump of 1800 WP(15X120Wp) each.

    Currently, BPDB is implementing Chittagong Hill Tracts Solar PV Electrification Project.

    PV Project (Phase-I) Status of Solar PV programme under BPDB : 

    (2344 Nos Solar System (Approved), 4437 (Consumer)

    Location: Bilaichari, Juraichari & Barkal Upazilla of Rangamati District & Thanchi Upazilla of Bandarban District.

    Already electrified: Juraichari Upazilla Sadar, Bonjogichara, Moidong, Dumduma Union, Shijak College of Baghachari Upazilla etc.

     

    Picture :  Solar Arrays of 10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.

    Picture :  Battery Bank and control room of  10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.

     Picture :Overhead distribution connection of 10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.

    Picture :Overhead distribution connection of 10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.

    Picture : Solar PV  electriccity uses in home appliances of 10 kWP Centralized AC Market Electrification Systems at Barkal Upazila under Rangamati District.

    Picture :  Solar PV powered Street light at Barkal Upazila under Rangamati District installed by Bangladesh Power Development Board (BPDB)

    Solar PV powered Street light at Barkal Upazila under Rangamati District installed by Bangladesh Power Development Board (BPDB)

    Solar PV powered Street light at Barkal Upazila under Rangamati District installed by Bangladesh Power Development Board (BPDB)

    Solar PV powered Street light at Barkal Upazila under Rangamati District installed by Bangladesh Power Development Board (BPDB)

    Solar PV powered Street light at Barkal Upazila under Rangamati District installed by Bangladesh Power Development Board (BPDB)

    Picture : Solar Street lights at Barkal Upazila

    Picture : Solar Street lights at Barkal Upazila

    Picture : Solar Street lights at Barkal Upazila

    Picture : Solar Street lights at Barkal Upazila

    Picture : Solar Street lights at Barkal Upazila

     

    Now SPV work is on going at Thanchi, Bandarban

    PV Project (Phase-II) System Details:

    Project cost: 1023.28 lakh taka, 842.70 lakh taka (amendment)

    On 22/8/2005 Completed work: 48.75 kw peak at 71.175 MWH yearly power produced

    At Barkal 48.75 Kw peak on going after that date and completed.

     

    Type of Unit Details Nos of Unit Total Amount in BD TK. Nos of Consumer
    A-Type 1800 Set (48.32 KW) 1800 Set SHS 1023 Lakh 1689
    B-Type 500 Set (32 kw) 500 Set SHS
    C-Type Solar Vaccination Refrigeration type (1.35 kw) 6 set
    D-Type Solar water pump type (1.8 kw ) 1 set
    E-Type Solar Street light (2.25 kw) 30 Nos.
    F-Type Centralized Solar PV Power Plant (28 KW) 7 set

    Phase-III Details : Project cost: 1993.62 lakh taka

    600 SHS at Thachi of 120 Watt Peak unit, Project cost: 4 Crores BD Taka. (Project on going)

    74.80 kw peak capacity of the work.

    CFL (compact florescent lamp)

    Bangladesh government has allocated an amount of 1(one) crore taka from its own source of fund against greater Chittagong power distribution project. A comprehensive study on the requirement and capacity of the lamps was completed. According to the requirement 21000 nos of 23 watt and 3000 nos of 14 watt lamp have already been procured and installed.

    Sugar Co-generation

    There is a good prospect of sugar Co-generation power plant installation in 50 sugar mills in Bangladesh . If government allows and allocate fund for feasibility study and there after installation of as many as 10-15 nos. of generator having 10-15 MW capacity each in the northern zone of Bangladesh. where maximum numbers of bagasse could be available from the sugar mills. This type of generation will help minimizing the low voltage problem in the remote and national grid. Cost will also be economical compared to the cost of generation of electricity by using fuel oil.

     