Biomass Energy development under Bangladesh Rural Advancement Committee (BRAC)
Biogas installation :
-
Energy Resource : Biomass
-
Type of installation : FBS/CBS
-
No of installation : 300
-
Capacity of installation : 1.8X104 cft
-
Cost of Installation : 34,904 US$
-
Location of Installation : All over Bangladesh
-
Present Condition : Functioning
BRAC has installed 2 power Unit using Biogas :
The power unit using biogas from cow dung (biomass). The DC generator is used for power generation :
1. Location : Shaturia Upazila under Manikganj District
Installed Capacity : 800Wp
Generator : DC
Input : Cow dung
2. Location : Shafipur Upazila under Tangail District
Installed Capacity : 800Wp
Generator : DC
Input : Cow dung